H&V Building Services Ltd was contacted to urgently investigate the loss of heating to the Queen Mary Wing of the National Hospital for Neurology and Neurosurgery.
The existing plant which had reached its life expectancy had operationally failed except for one boiler that was unable to cope with the system demand.
H&V Building Services managed to implement a quick fix solution by replacing one of the existing primary pumps, getting an additional boiler up and running.
The heating plant serving this wing was in the early stages of the complete plant replacement design and working alongside the design team we selected a boiler from the proposed design scheme for a permanent replacement, procured and installed this boiler into a new temporary pipework system which will allow the future complete replacement of the heating plant alongside the temporary boiler installation.
The works consisted of: